How can I select the right system for my project?
Please provide details regarding your water source, water quality, required flow rate, and available ground area. Our team will help determine the best model for your needs.
What are the payment terms?
We generally accept TT and L/C. A 30% deposit is required before production, with the remaining 70% balance due before loading.
What is the typical delivery time?
The delivery time depends on the order quantity. Generally, the standard lead time is between 4 to 6 weeks.
How is the equipment protected from corrosion?
We use world-famous high-grade industrial coatings and strictly follow standard painting processes to ensure long-term durability and corrosion resistance.
What manufacturing technologies are used?
Our manufacturing includes advanced laser/plasma cutting, automatic welding, CNC cutting, and precision bending technologies.
How is the installation handled?
We provide detailed illustrations and documentation for installation. If required, technical assistance can be arranged, subject to local site conditions.