Olaprixa Industrial Olaprixa Industrial

Iepp Automatic Polymer Municipal Wastewater Treatment Dosing System All in One Dosing Device Plant Polymer Preparation System

Customization: Available
After-sales Service: Online Service
Warranty: 1years

Product Description

Basic Information
Model NO.
Automatic Polymer Preparation System
Type
Chemical Dosing System
Method
Combined Treatment
Usage
Industrial, Home, Agriculture, Hospital
Material
Carbon Steel
Core Components
Motor, Bearing, Gear, PLC, Pump, Gearbox
Inspection
Video Outgoing-Inspection Provided
Capacity
100 Units
Product Description
Dosing System Banner

Automatic Polymer Preparation System is a complete range of polymer batching and metering systems. The unit automatically prepares polymer solutions which are used as coagulants for the eventual removal of suspended particles in water treatment processes. Applications range from swimming pool maintenance to various stages of wastewater treatment, oil recovery, colour removal, paper production, and mineral processing.

System Detail 1
System Detail 2

The polymer dosing device is composed of a hopper, push screw, electric heater, and more. The effective volume of the hopper meets long-term dosage requirements and includes sight glasses for material level monitoring. The push screw, driven by a high-precision reducer, ensures accurate dosage. An electric heater in the discharge pipe prevents powder from caking.

Dissolving Device

Polymer Dissolving Device: Composed of a pre-soaking device, tank, and 3 sets of mixers. The pre-soaking device infiltrates and mixes the polymer powder in advance. The three tanks (precast mixing, homogeneous slaking, and solution storage) each feature a corresponding mixer to guarantee solution homogeneity.

Technical Specifications
Model Power (kW) Dimensions (m) Outlet Size Material
YP-JY1000 2.43 2.0*1.0*1.7 DN32 SS304
YP-JY2000 2.43 2.2*1.2*1.9 DN32 SS304
YP-JY3000 4 2.4*1.3*2.2 DN40 SS304
YP-JY4000 4 3.0*1.4*2.2 DN40 SS304
Manufacturing & Quality
Manufacturing Process
Packaging & Shipping
Packaging 1
Shipping 2
Project Cases
Project 1
Project 2
Project 3
Project 4
Project 5
Frequently Asked Questions
1 Are you a factory or trading company?
We are a factory with over 15 years of rich experience in manufacturing sewage treatment equipment. We can provide professional drawings according to your specific requirements.
2 Can you meet special requirements for my products?
Yes, we have a professional design team capable of customizing equipment to meet unique project specifications.
3 How can I buy the right products for my needs?
Please provide us with details regarding your water sources, water quality, required flow rate, and available ground area for installation.
4 What are the accepted payment terms?
TT and L/C are both acceptable. Generally, a 50% deposit is required before production, with the remaining 50% balance paid before loading.
5 What is the typical delivery time?
Delivery time depends on order quantities. Generally, it ranges between 4 to 6 weeks.
6 Do you provide equipment inspections?
Yes, we provide machinery test reports and video outgoing-inspections for all equipment before shipment to ensure quality.

Related Products